I blinked and September was over. I can't believe that its October and I have been REALLY bad about blogging. So sad. Luckily my good friend Rebecca has recently gotten into blogging and it has inspired me to get back in as well. I have a lot to catch everyone up on….to say the least but tonight Im just going to talk about our garage progress.
Lets start at the beginning (Picture overload):
So the picture above would be our garage. When we first bought our house we knew that this thing would need to come down! I mean, just look at it. So at the beginning of the year we decided it was time to save our money up and get going with our new garage! Of course we weren't just going to re-build it. We were going to make it bigger and better.
So once we did a little research and decided what size and what type of building we wanted we ordered our plans. It took a bit to get those back but once we did we sent them off to the city to wait for our approval. Zac waisted no time to tear that sucker down. And she came down pretty easy.
Once the building was down it needed to tear up the old foundation. We were hoping that it would break down pretty easy but we found out that there were some really thick areas that were difficult. Zac was able to rent a skid steer jack hammer that helped the process move a little more quickly.
After everything was demolished it was time to clear everything out of the way. Zac made a few trips to the dump. It was time to rent test another tractor to smooth everything out and rough dig the footings. About that time we got a letter back from the city saying we needed a soil sample. Just the news that you want to hear. We were both a little frustrated with the news but knew that doing this the right way with permits wasn't going to be easy. So LONG story short we got our soil sample and sent that back to the city and they told us that we needed to get rid of the adobe dirt we have on our property and replace it with a "better dirt" for the garage to sit on.
Months went by…..Zac did all the research on what dirt we needed and who would deliver and how much we would need. We finally heard back from the city and our permit was approved (6 months later). Well, it was time for things to get moving. As soon as we heard bad it was game on and we were having our special dirt delivered.
Well after we got all that beautiful fancy new dirt Zac had to spread it all out and pack it down. We had to have our soil guy come out and check that everything was to code. We got the approval so we kept moving. It was 239 tons and 10 1/2 semi truck loads later and we had our dirt.
What do you think of our new dirt? Isn't it wonderful. Well after you have all this dirt in place its time to add the drain rock. So another truck delivering a bunch of rock was our next step in the process.
Arn't you learning so much about garage building? So exciting, I know. Well after you have the drain rock then you need a plastic vapor barrier.
And then sand, lots and lots of sand.
Once you get the sand all spread out it was time to get our form boards up! Once I saw the form boards it was feeling more real, like it was actually happening. I honestly didn't think we would be able to be getting our garage only 3 years after moving in. Zac wanted to go with a 24 x 40 garage and he is hoping to be able to put his boat and power wagon in there.
I must say I am excited about having our yard look a little nice with our new garage. I am also excited that I will get a back patio area with a fire pit. For my birthday this year Cindy, Steve and Zac bought me a beautiful redwood slab with some wine barrels. I plan on making a bar area on our back patio. I can't wait for that!
Once the footings were up and the re-bar was in Zac went ahead and ordered our building. We didn't want to order it to soon and have it show up before our foundation was ready. The building should be here by the end of October at the earliest and into November at the latest. With how slow this whole process is Im not getting my hopes up.
So last Friday the cement was here! Zac had everything orchestrated to the "t". I can't tell you how many things he had to plan out with time, who, what, where, amount and cost! He amazes me.
Here we go….
Its probably about a 10 inch slab. He should be able to put whatever he wants on there!
So this is where we are at as of today. I must tell you that we had a little hiccup. Zac was really unhappy with how the foundation was finished, which is understandable because when you walked around you could see a bunch of lumps and bumps. With Zac actually using his garage to work on things he needs to be able to roll car jacks and other heavy things around without it getting caught. So last Monday we spent the entire day grinding it down to make it smoother. It was quite a job and took us ALL day, but he feels much better about it and that all I care about.
It might not look that large in the picture but two of those squares would fit our Dodge 2500….so we could probably fit 6 of them on that slab. Anyways, Ill keep ya'll posted. I'll also try to update you on my month of September. Its been busy to say the least!